- A. About the inspection and report
- Terms of engagement and the client’s acceptance, intended use, occupancy, conflicts, competence and referrals.
- B. Summary of condition ratings
- Your overall opinion of the property, written once you have rated the elements.
- C. About the property
- Pre-inspection research, information provided, accommodation, mains services, energy matters, and location and facilities.
- D. Outside the property
- D1 chimney stacks to D9 other outside elements, including roof coverings, rainwater goods, main walls, windows and outside doors.
- E. Inside the property
- E1 roof structure to E9, including ceilings, walls and partitions, floors, fireplaces and flues, woodwork and bathroom fittings.
- F. Services
- F1 electricity, F2 gas or oil, F3 water, F4 heating, F5 water heating, F6 drainage and F7 common services.
- G. Grounds
- G1 garage, G2 permanent outbuildings and other structures, G3 other grounds elements, including shared areas for flats.
- H. Issues for legal advisers
- Regulations, guarantees and other matters for the client’s conveyancer.
- I. Risks
- Risks to the building, to the grounds, to people, and other risks.
- J. Property valuation (optional)
- A market value, a reinstatement cost or both, only when the client agreed them. The declaration and next actions move down a letter.
- Declaration, further investigations and next actions
- Your signed declaration, the further investigations you recommend, post-report liaison and the documents to obtain or verify for each element.